We had GREAT time on the our carribean cruise, we managed to successfully forget about this entire flooring project, and the work that awaited us upon our return home. But, come Sunday night, reality struck, we were back home...
As you saw, before we left, we had finished laying a great deal of flooring in the
den and dining room. With the den and dining room close to finished, we needed to move on into our family room, kitchen and master bedroom.
To remove the carpet and tile in the rest of the home, we redesigned our Master Bathroom so it now resembles our old Den...
Our new linen closet, it closely resembles our old bathtub...
After some "rearranging", we moved ourselves into the now FINISHED back wing, and started the demo work in the rest of the home. Here is a shot of our cabinets ready for tile demo...
We have taped all of the cabinets so that dust doesn't get in them when we tear up the tile and thin set. And, yes, that is tape over our sink, we needed to remind ourselves NOT to use the sink since after removing the dishwasher we had a "gushing water" problem when the water was running (after a mere FOUR trips to Home Depot, we found the right size cap to fix this issue)...
Finally, we were ready to go, appliances in the corner covered (don't worry, the fridge is still plugged in), cabinets taped, tile coming up!
After a few hours of taking up tile, scraping off thin set, and then loading and unloading said items at the dump, we celebrated/drowned our sorrows...
It's time to get serious, we no longer have a kitchen...